Are your control loops more restless than they need to be?

Most PID controllers are tuned once and then left alone for years, while the process does change. The twelve signs below are each small, but they often point to loops that operators keep correcting, that keep raising alarms or that come closer to the trip limit than necessary. Check them for your plant. One minute, and your result right away.

Twelve signs

0 of 12 answered

  1. 01 / 12

    Are there control loops that operators regularly switch to manual, or where they nudge the setpoint to keep the process under control?

  2. 02 / 12

    Are there control loops that keep giving the same alarm, even when nothing is really wrong?

  3. 03 / 12

    During disturbances, do process values come close to a trip limit, or has a control loop ever contributed to a trip or near-trip?

  4. 04 / 12

    Do control loops regularly show overshoot or recurring oscillations around the SP?

  5. 05 / 12

    After a disturbance or setpoint change, does it often take longer than you would expect before the PV is stable around the SP again?

  6. 06 / 12

    Does the control behaviour clearly change with a different load, production capacity, recipe or operating conditions?

  7. 07 / 12

    Are there control loops whose output keeps moving up and down, while the SP and process load are fairly constant?

  8. 08 / 12

    Are there control loops that make many or large corrections, while that has hardly any visible effect on the PV?

  9. 09 / 12

    Do outputs regularly run into their minimum or maximum, so the controller temporarily has no control room left?

  10. 10 / 12

    Are there control loops where the PV stays above or below the SP for a long time, without the controller removing that offset?

  11. 11 / 12

    Are there control loops that react strongly to small fluctuations or measurement noise in the PV, so the output keeps correcting unnecessarily?

  12. 12 / 12

    Have the P, I and any D settings of your control loops mainly grown over time or been adjusted by feel, rather than substantiated from process behaviour or trend data?

  13. About your plant · 1 / 3

    What is your role?

    You may skip this. It helps us put your answers in context.

  14. About your plant · 2 / 3

    Roughly how many control loops does your plant have?

    You may skip this. It helps us put your answers in context.

  15. About your plant · 3 / 3

    When were the control loops last reviewed systematically?

    You may skip this. It helps us put your answers in context.

Would you rather talk straight away?

Tell us which control loop is running restlessly. In a first conversation we often already know whether there is something to gain.